Scroll

03 — The range

Everything on your floor plan,
from one supplier.

Task seating through to the tables they sit at, in the quantities a full floor needs. One PO, one invoice, one person answering the phone.


02 — The real cost

A cheap chair is not cheap.
It is just billed later.

The quotation shows one number. These nine parts carry the rest of it. On 100 chairs the list below adds up to well over ₹1.5 lakh across three years — and none of it was in the price you compared.

1 2 3 4 5 6 7 8 9 OC / MC-2200 · SIDE ELEVATION · NOT TO SCALE
01HeadrestLeft off a budget chair entirely. Staff get up every two hours and you never see it on a bill.Lost hours
02BackrestWoven mesh bags out in eight months. The floor looks tired long before the lease is up.₹1,200 re-mesh
03Lumbar supportA fixed lumbar fits one body shape. Back complaints start around month three.Medical leave
04ArmrestFirst part to break. Within a year no two chairs on the floor match.₹300 × every chair
05Seat foamCut foam flattens in a year. People can feel the board through it.₹900 re-foam
06MechanismThe tilt lock lets go and the chair tips back with someone in it.Safety + ₹650
07Gas liftA class-2 lift starts sinking by month six. This is the most common failure of all.₹500 × 100 = ₹50,000
08BaseThin plastic cracks under load. This is the one that puts a person on the floor.₹450 + liability
09CastorsHard wheels score vitrified tile. The damage only shows up when you hand the office back.₹25,000 floor polish

04 — How it is built

Six stations.
Nothing bought and re-badged.

Every failure in section 02 is either created at one of these six stations or stopped at it. This is also why a repeat order five months later still matches the first one.

01

Tube bending & frame

MS tube is cut, bent and jig-welded, then powder-coated at 180°C. Cantilever and beam frames run in the same batch, so the black on a visitor chair matches the black on a workstation chair.

180°Cpowder cure
02

Foam moulding

Seat and back foam is poured into moulds at 40-density instead of being cut from a sheet. Moulded foam holds its front edge — that edge is exactly where a cut-foam seat gives way first.

40 kg/m³seat density
03

Cutting & upholstery

Fabric and leatherette are cut to pattern, stitched and pulled over the foam by hand. Your shade is signed off against a physical swatch before a single metre is cut.

1 swatchsigned off first
04

Sub-assembly

Mechanism, class-4 gas lift, base and castors are married to the seat pan. Torque is set per joint, so the chair that leaves is the chair you approved.

Torque-setevery joint
05

Load & QC

Chairs are pulled from every lot and put on the rig: seat drop, back cycling, base load, castor run. One failure sends the whole lot back a station.

BIFMA X5.1test protocol
06

Pack & dispatch

Five-ply cartons, corner guards, fitment kit and an assembly card in every box. The loading plan reaches your site before the truck does, so your team knows what lands first.

5-plycarton

05 — Your spec

Build it here.
Send us the code.

Four choices decide most of the cost and all of the comfort. The code updates as you pick — put it in your enquiry and we quote that exact chair, not a photo.

Live preview

OC-MC-2200-BLK-NY-3D

Back

Headrest

Base

Armrest

BackKnit mesh
HeadrestWith headrest
BaseNylon 66
Armrest3D adjustable
MechanismSynchro-tilt, 3-lock
Sample lead time7–10 days

06 — Why us, in numbers

No adjectives.
Just the numbers.

Purchase orders accepted. Sample first, then the lot, on a dispatch plan built around your handover date instead of our production queue.

0Chairs built a week
0Categories, all in-house
0Cities we deliver to
0Year warranty, in writing
Order bands — indicative, confirmed on your quote
Order sizeSamplingProductionDispatch
10 – 50Stock sample, 2 days7 – 10 daysSingle consignment
50 – 200Spec sample, 7 days12 – 18 daysSplit by floor
200 – 500Spec sample + load test21 – 30 daysPhased to site
500+Pre-production lotScheduled releaseAgainst fit-out plan

07 — After delivery

Where most suppliers
stop answering.

Every problem in section 02 happens after your invoice is paid. That is exactly where a supplier either shows up or disappears. Here is what we commit to.

Warranty

3 years, in writing

Frame, base and mechanism, from the date of delivery. Gas lifts and castors are wear parts, replaced at cost after year one. You get this on paper with the quote — not as a promise on a call.

On-site service

A technician at your desk

Gas lift, base, mechanism and castor replacement done on your floor. Re-upholstery is collected in batches and back inside a week. You never pack a chair and ship it anywhere.

Spares

Held for five years

Wear parts for every model we ship stay on the shelf for five years. The chair you buy today does not quietly become unrepairable in 2031.

08 — Your next step

One sample.
One honest quote.

Send headcount, categories and city. You get a written quote inside 24 hours and a sample chair you can actually sit on before you commit to the lot. No charge for either.

Nothing was sent. This page has no mailbox behind it yet, so your enquiry stayed in the browser. Copy the details across to us directly and we will pick it up the same day.

mis@oakcraft.in