01 — Before you sign the PO
If any of these are running in your head right now, you are asking the right questions. Every one of them is answered further down this page.
The sample is perfect. The lot that arrives is not. And nobody checks 100 chairs at the gate.
01Four quotes, four prices, the same photo. You cannot tell what you are actually paying for.
02Handover is fixed. If the chairs slip ten days, you are the one who has to explain it.
03Six months in, a gas lift starts sinking. Now the number you called does not pick up.
04Trader to trader to factory. Every hand adds margin and not one of them owns the problem.
05You need a GST invoice, supply against a PO, and the warranty in writing — not on a phone call.
0603 — The range
Task seating through to the tables they sit at, in the quantities a full floor needs. One PO, one invoice, one person answering the phone.

Mid-back daily driver. Nylon base, single-lock tilt.
OC / CC
Knit back that holds shape through a full shift.
OC / MC
Headrest, lumbar, synchro-tilt, 3D arms.
OC / EG
Cantilever frame, stackable, no moving parts.
OC / VC
High back, cushioned arms, leatherette or fabric.
OC / EX
Gas-lift stool with footring, for high counters.
OC / BR
Medium back with fixed arms, matched across a table.
OC / CFDesks, workstations and boardroom tops with wire access.
OC / TB02 — The real cost
The quotation shows one number. These nine parts carry the rest of it. On 100 chairs the list below adds up to well over ₹1.5 lakh across three years — and none of it was in the price you compared.
04 — How it is built
Every failure in section 02 is either created at one of these six stations or stopped at it. This is also why a repeat order five months later still matches the first one.
MS tube is cut, bent and jig-welded, then powder-coated at 180°C. Cantilever and beam frames run in the same batch, so the black on a visitor chair matches the black on a workstation chair.
Seat and back foam is poured into moulds at 40-density instead of being cut from a sheet. Moulded foam holds its front edge — that edge is exactly where a cut-foam seat gives way first.
Fabric and leatherette are cut to pattern, stitched and pulled over the foam by hand. Your shade is signed off against a physical swatch before a single metre is cut.
Mechanism, class-4 gas lift, base and castors are married to the seat pan. Torque is set per joint, so the chair that leaves is the chair you approved.
Chairs are pulled from every lot and put on the rig: seat drop, back cycling, base load, castor run. One failure sends the whole lot back a station.
Five-ply cartons, corner guards, fitment kit and an assembly card in every box. The loading plan reaches your site before the truck does, so your team knows what lands first.
05 — Your spec
Four choices decide most of the cost and all of the comfort. The code updates as you pick — put it in your enquiry and we quote that exact chair, not a photo.
Live preview
06 — Why us, in numbers
Purchase orders accepted. Sample first, then the lot, on a dispatch plan built around your handover date instead of our production queue.
| Order size | Sampling | Production | Dispatch |
|---|---|---|---|
| 10 – 50 | Stock sample, 2 days | 7 – 10 days | Single consignment |
| 50 – 200 | Spec sample, 7 days | 12 – 18 days | Split by floor |
| 200 – 500 | Spec sample + load test | 21 – 30 days | Phased to site |
| 500+ | Pre-production lot | Scheduled release | Against fit-out plan |
07 — After delivery
Every problem in section 02 happens after your invoice is paid. That is exactly where a supplier either shows up or disappears. Here is what we commit to.
Frame, base and mechanism, from the date of delivery. Gas lifts and castors are wear parts, replaced at cost after year one. You get this on paper with the quote — not as a promise on a call.
Gas lift, base, mechanism and castor replacement done on your floor. Re-upholstery is collected in batches and back inside a week. You never pack a chair and ship it anywhere.
Wear parts for every model we ship stay on the shelf for five years. The chair you buy today does not quietly become unrepairable in 2031.
08 — Your next step
Send headcount, categories and city. You get a written quote inside 24 hours and a sample chair you can actually sit on before you commit to the lot. No charge for either.
Nothing was sent. This page has no mailbox behind it yet, so your enquiry stayed in the browser. Copy the details across to us directly and we will pick it up the same day.
mis@oakcraft.in